Skip to content
POOJYO
GarlandsMixedConsumable

Reception Garland

Lighter and more photogenic than the muhurtham pair, built for a long evening under stage lights.

₹1,600per pair
130 cm long

Where to buy

Every shop that carries it, cheapest in-stock first.

Price, stock and lead time are properties of the AVAILABLE_AT relationship — the same product costs different amounts at different shops, and that fact belongs to the pairing.Product → AVAILABLE_AT → Florist → LOCATED_IN → Location

Shops selling Reception Garland
ShopAreaRatingPriceAvailability
Sri Kamakshi Flower StallT. Nagar 4.7(412)₹1,376In stock · Same day
Kapali Flower MartMylapore 4.3(201)₹1,408In stock · Same day
Madurai Mala KadaiMeenakshi Nagar 4.6(288)₹1,440In stock · Same day
Dadar Phool GalliDadar 4.7(891)₹1,440In stock · Same day
Mylapore Mala StoresMylapore 4.8(638)₹1,472In stock · Same day
Indiranagar BloomsIndiranagar 4.2(143)₹1,568In stock · Same day
Dadar Mala CornerDadar 4.3(224)₹1,632In stock · Same day
Kothrud Phool GharKothrud 4.4(176)₹1,728Out of stock

7 of 8 shops have it in stock right now.

If you can't get it

Alternatives found by walking the substitution chain up to three hops.

Closeness is multiplied along the chain, so a substitute reached in two hops automatically scores lower than a direct one — no rule had to say so.Product → SUBSTITUTE_FOR*1..3 → Product

Wedding Garland (Pair)In stock nearby

Heavier than ideal for an evening, but the same construction.

Match
70%
₹2,400
per pair

Needed for

Every occasion that calls for this, and how much each one needs.

Exactly the same relationship as the checklist, traversed in the other direction and at the same cost. A relational schema would need a second index for this.Occasion → NEEDS → Product (read backwards)

How Reception Garland connects to Wedding (Kalyanam)

The route the graph took, not just the fact that a route exists.

This is the query with no relational equivalent. A join returns rows; the joins that connected them are gone by the time the result exists. Only a graph can hand back the path itself.shortestPath, up to 6 hops

  1. Reception Garland is needed by
  2. Wedding (Kalyanam)

1 hop through the graph